background image

Part

Picture

Qty

Description

Part

Picture

Qty

Description

A1

1

BOTTOM 1

K2

2

SUPPORT FOR

FOOT STEP

B2

1

BOTTOM 2

L3

10

WHEEL COVER

C3

1

BOTTOM 3

M4

2

SHORT 

CONNECTING 

ROD

D4

1

BOTTOM 4

N5

2

LONG 

CONNECTING 

ROD

E5

1

BOTTOM 5

O6

2

CYLINDER

F6

2

AXLE 1

P7

1

CART WALL

(LEFT)

G7

3

AXLE 2

Q8

1

CART WALL

(RIGHT)

H8

6

SMALL WHEEL

R9

1

CART WALL

(FRONT)

I9

4

THE BIG 

WHEEL

S1

1

CART WALL

(BACK)

J1

2

FOOT STEP

T2

1

CARRIAGE TOP

www.ZAERLTD.com

PG 1

[email protected]

215.766.2010

ZAER LTD. INTERNATIONAL

ASSEMBLY INSTRUCTIONS

ITEM NO.: ZR200777 12.5 ft. Long LG Iron Christmas Train with Cart and Lanterns "The North Pole Express"

Please read instructions thoroughly before assembling this product. Familiarize yourself

 with inventory of parts and the accompanying illustrations to ensure safe and proper assembly.

PARTS LIST

[email protected]

215.766.2010

Summary of Contents for ZR200777

Page 1: ...EL R9 1 CART WALL FRONT I9 4 THE BIG WHEEL S1 1 CART WALL BACK J1 2 FOOT STEP T2 1 CARRIAGE TOP www ZAERLTD com PG 1 sales zaerltd com 215 766 2010 ZAER LTD INTERNATIONAL ASSEMBLY INSTRUCTIONS ITEM NO...

Page 2: ...8mmX50mm P6 14 SCREW 8mmX20mm Q7 11 SCREW 6mmX15mm R8 8 SPACER 20mm www ZAERLTD com PG 2 sales zaerltd com 215 766 2010 ZAER LTD INTERNATIONAL ASSEMBLY INSTRUCTIONS ITEM NO ZR200777 Please read instru...

Page 3: ...erltd com 215 766 2010 ZAER LTD INTERNATIONAL ASSEMBLY INSTRUCTIONS ITEM NO ZR200777 STEP 1 Locate and connect the Bottom Parts A1 B2 C3 D4 E5 with corresponding Nuts I8 and Screws N4 A1 B2 C3 D4 E5 N...

Page 4: ...ing Nuts K1 STEP 3 Lock Support for Foot Step K2 to Foot Step J1 with Nuts J9 and Spacer R8 Attach the assembled Foot Step K2 J1 J6 R8 to the Bottom assembled in previous step with Screw P6 Then attac...

Page 5: ...L ASSEMBLY INSTRUCTIONS ITEM NO ZR200777 STEP 4 Locate and assemble the Carriage Side Walls U3 V4 X6 Y7 and secure the Carriage Top T2 to the assembled Side Walls U3 V4 X6 Y7 using Nuts L2 Then attach...

Page 6: ...own with Nuts I9 L2 Combine the Boiler Part 1 D3 and Boiler Part 2 E4 sales zaerltd com 215 766 2010 ZAER LTD INTERNATIONAL ASSEMBLY INSTRUCTIONS ITEM NO ZR200777 STEP 5 Locate Cart Walls P7 Q8 R9 S1...

Page 7: ...m STEP 6 with Screws Q7 Locate Pipe F5 and attach to the Boiler with Nuts L2 Then attach the assembled Boiler to the Bottom from STEP 3 with Screws N4 sales zaerltd com 215 766 2010 ZAER LTD INTERNATI...

Page 8: ...s O5 and Screws K1 Locate Lanterns G6 and secure them to the Carriage from STEP 4 with Nuts Q7 Attach the Cart STEP 5 and Carriage STEP 4 to the assembled Bottom Part STEP 3 with Nuts P6 sales zaerltd...

Page 9: ...nd Lesera Retail on Social Media Zaer Ltd Facebook Instagram zaerltdinternational Lesera Facebook Instagram leserahg Safe for both indoor and outdoor use year round Clean with damp dry cloth use clear...

Reviews: