4
III.Instructions
1
、
Control Box
See figure 4-1
Figure 4-1a front panel of control box
Figure 4-1b back panel of control box
1.Control lever: used for setting parameters and regulating voltage.
It can be rotated and pressed. Press can be divided into short-time press and
long-time press. "short-time press" is the function of selecting confirmation or
switching, and "long-time press" is the exit function. "Rotation" is the function of
switching items or boosting voltage. According to different interface operation,the
functions slightly different,users can refer to the screen display to operate.
2. Printer: needle printer for printing out test results.
3. Power switch: control the power supply on/off .
4. High voltage off / power indicator: green with indicator button. When the light is
on,it indicates that the high voltage is off state, the power has been connected. When
the red light is on, press the green button, the red light turns off and the green light
turns on, and the high voltage loop is cut off.
5. High-voltage on indicator and button: red, with indicator button. The light is on to
indicate that the high voltage is on. It can output or has output high voltage. In the
specific status interface, when the green light is on, press the red button of this color,
the red light is on and the green light is off, indicating that the high voltage circuit is
connected, and the boost test can be performed at this time.
6.0.75U
DC1mA
button: yellow button with indicator light. In the state of high voltage on,