background image

Dear user:

Thank you for choosing HZDL-2000III Primary Current lnjection Tester.

We hope that this instrument can make your work easier and more

enjoyable, so that you can get the feeling of office automation in the test

and analysis work.

Before using the instrument, please read this manual, and operate and

maintain the instrument according to the manual to prolong its service life.

"Just a light press, the test will be completed automatically" is the

operating characteristics of this instrument.

If you are satisfied with this instrument, please tell your colleagues;

if you are not satisfied with this instrument, please call (0312) 6775656 to

tell you to serve you at all times-Baoding Huazheng Electric Manufacturing

Co., Ltd., our company will definitely make you satisfied !

Summary of Contents for HZDL-2000III

Page 1: ...HZDL 2000III Primary Current lnjection Tester Huazheng Electric Manufacturing Baoding Co Ltd...

Page 2: ...anual and operate and maintain the instrument according to the manual to prolong its service life Just a light press the test will be completed automatically is the operating characteristics of this i...

Page 3: ...Contents I Overview 1 II Technical features 2 III Working principle 2 IV Panel description 3 V Instructions 4 VI Safety Precautions 4 VII Transportation and maintenance 5 VIII Packing list 6...

Page 4: ...teristics Use beautiful and generous PVC panel Display the primary current directly which is convenient for test observation and recording High measurement accuracy 0 5 level High power strong load ca...

Page 5: ...ripple coefficient is less than 0 3 Standard sine wave 2 6 Measurement accuracy using 0 2S grade material is actually about 0 3 each current can be smoothly and continuously adjustable and the accurac...

Page 6: ...igital real time acquisition method by measuring the voltage signal amplitude according to the voltage proportional relationship the high voltage measured voltage value can be calculated and the autom...

Page 7: ...the operation of lack of phase and unbalanced operation of three phases only one phase needs to be disconnected or adjusted to zero and open 5 If there is only 220V power supply on site you can short...

Page 8: ...n dust and mechanical damage 2 Storage The instrument should be stored in a ventilated non corrosive room with an ambient temperature of 20 60 relative humidity not exceeding 85 It should not be place...

Page 9: ...6 VIII Packing list Attached picture system wiring No Name Qty 1 Test line 3 meters 12 2 Test line 1 square 6 3 Ground wire 1 4 Zero line 1 5 power cable 1...

Reviews: