IV. Instrument Structure And Installation
1) Instrument Installation
A. Unpack the instrument and make sure that the equipment is in good condition.
B. Check instrument model and all accessories according to the packing list.
C. Please debug the instrument after inspection step 1 & 2.
2) Starting-up Preparation
A. Connect the instrument to the AC 220V power supply;
Note: Always use a power outlet with a reliable ground to power the instrument;
B. Clean the oil cup with petroleum ether, pour sample liquid into the oil cup to the scale
mark, and put into the heater.
V. Usage And Operation Procedures
1
、
Test Procedure
① 、
Turn on the power switch, and see figure 5-1 for the screen display device in
self-inspection.