4
instrument and discharge them automatically after each test.
IV.Installation and Precautions of the Instrument
1. After unpacking the instrument, first perform the unpacking inspection according to the
packing list at the end of the manual. In the case that the instrument may be severely
dropped, open the upper cover of the instrument for inspection, and check the circuit
board installed on the front panel in detail Check whether there is pressure breakage
and disconnection of the power cord, whether the cable of the whole machine is
broken, and whether the connections on the rear panel are normal. Install it only after
confirming that it is intact. Otherwise, it should be restored before installation.
2. Install all additional equipment and connecting pipes according to the following figure: