background image

2

immediately and seal it up for keeping at once, which shall be dealt with by qualified authorization

agency.

The danger symbol “

“on the meter and the manual, the user must make safe operation

according to the indication.

The extremely dangerous symbol “

”, the user must make safe operation according to the

indication.

It suggests that this meter shall be made insulation intensity test at least once annually. (AC

100kV/rms between insulation pole and clamp core.)

As to the part with “*”mark in this manual, it is only limited to HZCR9000B type (wireless

Transmission data type).

Summary of Contents for HZRC 9000

Page 1: ...HZRC9000B High Low Voltage Clamp Meter USER MANUAL Huazheng Electric Manufacturing Baoding Co Ltd...

Page 2: ...CONTENT Warning 1 I Brief Introduction 3 II Electrical Symbols 3 III Series Model 4 IV Technical Specification 4 VI LCD Display 6 VII Operation 8 VIII Replacing Batteries 13 IX Accessories 14...

Page 3: ...strictly forbidden to use this meter to test the wire without any insulate protection has voltage exceed 35KV or convergence generatrix Please pay attention to marked words and symbols on panel or ba...

Page 4: ...eration according to the indication The extremely dangerous symbol the user must make safe operation according to the indication It suggests that this meter shall be made insulation intensity test at...

Page 5: ...reservation data storage wireless transmission and other functions and its special clamp meter can make it easier for clamping or evacuating the tested wire through pressing or pulling back the insula...

Page 6: ...supervision Power Supply DC6V Alkaline Dry Battery 1 5V AAA X 4 Test Method Clamp CT Integral Method Transmission Method B Model Wireless Transmission the maximum distance for direct transmission is...

Page 7: ...lay then press HOLD Key to cancel this function Data Access MR symbol indicates it can read the stored data by turning upwards and downwards Overflow Display Exceed measurement range overflow function...

Page 8: ...Type II V Structure 1 Double input toroid including the boot area 2 HZCR9000 Tester 3 LCD Display 4 PEAK Test Indication 5 PEAK Key 6 POWER Key 7 HOLD Key 8 HZCR9000B Receiver 9 Insulation Rod Connec...

Page 9: ...ol when the storage memory has been filled with 99 groups of data it will display FULL symbol by flash which means it cannot continue to store data MR data access symbol which is displayed during look...

Page 10: ...o damage before usage According to manual instructions to install the battery A Tester Operation 1 Power On Off Press POWER button to power on the instrument will displays the LCD screen entering norm...

Page 11: ...ng personal damage or equipment damage General Test In the process of test LCD will display the tested current value real time and LCD data will vary with the current change When the tester is removed...

Page 12: ...domain perpendicular to the lead when moving away Under HOLD mode press HOLD button to cancel HOLD function and return to normal testing mode Under data reference mode press POWER button for more than...

Page 13: ...intenance Under normal testing mode press HOLD button to keep LCD display HOLD symbol displays Press HOLD button again to release data lock returning to normal testing mode and HOLD symbol disappears...

Page 14: ...ormal testing mode If LCD display is relatively dark after power on it is possible that battery voltage is a bit lower Please replace battery 15 minutes after powering on the meter if it remains idle...

Page 15: ...group 1 s data automatically after reaching the last group s data in storage Press POWER button for more than 3 seconds to exit from data reference mode returning to receiving data mode During the ex...

Page 16: ...ton to check whether the meter can be powered on normally If not please repeat the operation according the step 2 IX Accessories Tester 1PCS Receiver HZRC9000B special 1PCS Insulation Rod 1M Section 5...

Reviews: