- 13 -
20) Power switch: control the three phase input power supply
21) Input power cable connector: connect the three phase input cable
22) Robot connector: connector X1 connect with robot
23) Arc voltage output fuse: arc voltage output
24) CNC connector: connector X2 connect with CNC system or other automatic cutting
equipment control signal
25) Arc voltage output signal: connector X3 connect analogue control signal, pin 1 is +, pin 2
is -. the factory set arc voltage output ratio is 1:50
26) Gas input connector: connect gas supply
27) Shield ground connect terminal: connect ground cable
28) Plasma torch plug: connect torch
29) Earth cable plug: connect earth cable
Installation
1.Acceptance inspection & Delivery
Please confirm all the items in your order are got in good condition, if any lost, please
contact the supplier.
Please check if all the components are all right, if any physical damages, please contact
the supplier.
2. Product defect
Any defect for the machine outside or inside, please contact supplier
3.Installation requirements
All the electrical and pipe system installation must be operated by qualified staff.
Summary of Contents for POWERCUT105
Page 22: ...18 Ratio Connection Ratio Connection 1 50 1 40 1 30 1 21 1 1 20 1 1...
Page 41: ...37 3 Circuit Diagram...
Page 42: ...38...