Huayu HY-MDL Installation And Operation Manual Download Page 3

Huayu(Ningbo)New Energy Technologies Co.,Ltd. All rights reserved. 

c

This indicates a situation where failure to follow instructions may be a safety hazard or cause equipment
malfunction. Use extreme caution and follow instructions carefully.

PLEASE READ THIS MANUAL BEFORE INSTALLATION. ANY DAMAGE TO THE PRODUCT DUE TO NOT
FOLLOWING THIS MANUAL IS NOT COVERED BY THE WARRANTEE.
BESIDES THE CABLE CONNECTORS, NOTHING INSIDE THE MONITORING DATA LOGGER SHOULD
BE MODIFIED.
ALL INSTALLATION SHOULD FOLLOW THE LOCAL ELECTRIC CODES.
HY-MDL/HY-MDL-3 DOES NOT INCLUDE COMPONENTS THAT CAN BE SERVED BY CUSTOMERS. 
PLEASE CONTACT AUTHORIZED SERVICE AGENTS FOR ANY SERVICE WORK.

1. Introduction 

01

1.1 Prefix

1.2 How to Use this Manual 

1.3 Safety Instruction

Company Profile

Huayu New Energy is dedicated to be a world’s leading “Safe & Smart Solar Energy” supplier for homeowners. 

“For our home energy independence” is a vision deserved for all people who truly trust clean energy is the future for
our children, whatever you’re from rich families or low-income families.
Since the establishment of Huayu New Energy, we specialize in R&D of Safe Module-Level Solar Solution and Smart
Energy Storage Solution which are controlled by Huayu Portal Management Platform with over 10 languages, these
innovative technologies are developed to configure a Smart Distributed Solar System with bidirectional flow of energy
which no doubt is the basic infrastructure of our future Energy Internet. 
Featured with “Renewable, Distributed, Interconnected, Open & Intelligent”, Energy Internet is a must for human
beings in 21st century to realize a de-monopolistic & de-centralized sustainable power supply system across the
globe. Huayu New Energy was born to be the leader of “Safe & Smart” distributed energy solution and play an
irreplaceable role for the most exciting renewable energy revolution in human history.

Till today, we have delivered thousands of Huayu microinverters(300-2000W)and Huayu storage inverters(3-12kW)for
global families and small businesses in Europe, North America, LATAM, South East Asia, Middle East and Africa.

Together with us, to be a part of game changer for “Safe & Smart Energy” via “Honesty, Trust, Teamwork & Sharing”. 

Dear customer, thank you for choosing the HY-MDL/HY-MDL-3 communication monitoring data logger for Huayu
micro inverters. We hope you will find our products meet your need for renewable energy. Meantime, we appreciate
your feedback regarding our products.

This manual provides detailed product information and installation instructions for the HY-MDL/HY-MDL-3 monitoring
data logger. Please read through this manual before installation and operation.

Summary of Contents for HY-MDL

Page 1: ...Installation and Operation Manual HY MDL HY MDL 3 For our home energy independence Huayu Ningbo New Energy Technologies Co Ltd...

Page 2: ...Use This Manual 4 User Interface 03 03 4 1 Main Interface 03 4 2 Interface Overview 04 4 3 Energy Functions 06 4 4 Setting 07 4 5 Backup Clear Data 08 4 6 Status Bar 02 2 FCC Compliance 3 Installation...

Page 3: ...al Management Platform with over 10 languages these innovative technologies are developed to configure a Smart Distributed Solar System with bidirectional flow of energy which no doubt is the basic in...

Page 4: ...equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instructions may cause harmful interference to radio communications However there...

Page 5: ...r at the lower part of the screen The tool bar contains 7 buttons Save Clear Backup Restore Factory Defaults Summary Display Summary Display Interface Today s Energy Current Day Power Generation 7 Day...

Page 6: ...20 00 and the y axis represents Huayu micro inverters output power kW The total output energy kWh is displayed on the upper left corner The real time output power kW and today s total energy generated...

Page 7: ...r the last 12 months see Figure 8 This display is similar to the Last 7 Days Energy display The x axis represents months and the current month is in the last The y axis represents the amount of energy...

Page 8: ...ications address settings tab Figure 12 is used to set the power line communication address of the micro inverters linked to the device One HY MDL HY MDL 3 monitoring data logger can monitor up to 255...

Page 9: ...n and press Yes on the confirmation window that appears to clear all collected data The device settings will not be changed The bottom field on all display pages consists of the status bar which displ...

Page 10: ...through Huayu Portal from anywhere at anytime To access the web portal inside HY MDL HY MDL 3 user only needs to type in the IP address of HY MDL HY MDL 3 on a web browser please see Section 4 4 1 for...

Page 11: ...auto sensing auto negotiation 40 C to 55 C 40 to 131 F Natural convection no fans Indoor NEMA 1 1 year UL 60950 1 2nd Edition Rev Dec 19 2011 CSA C22 2 2nd Edition Rev Dec 19 2011 FCC Part 15 Class B...

Page 12: ...Huayu Portal Mobile App Tel 86 574 8925 8801 Add No 456 Xingning Road Ningbo 315100 P R China E mail info huayu energy com Website www huayu energy com...

Reviews: