FusionModule1000A40 Prefabricated All-in-One Data
Center
Commissioning Guide
8 Commissioning Core Components
Issue 02 (2019-12-20)
Copyright © Huawei Technologies Co., Ltd.
62
Port Name
Port Description
Remarks
app on the mobile phone to
obtain the initial startup
password.
Insert the USB flash drive,
import and export the
configuration file, export run
logs, and upgrade software.
(6) RST
Reset the MDU.
N/A
(7) SD
SD card slot
N/A
(8) SW1–4
DIP switch
N/A
The ports are protected by a security mechanism.
Procedure
Step 1
Check the alarm indicator. If an alarm is displayed, clear the alarm.
Step 2
Verify the MDU configurations based on the integrated UPS user manual.
During the MDU power-on commissioning, you are not allowed to modify the MDU initial
configurations unless you are authorized by onsite Huawei engineers.
Step 3
Enter a user name and password to access the MDU, set the user name, password, time, and
language, and check that the initial parameter settings are correct.
For the setting method, see the integrated UPS user manual.
----End
8.2 Commissioning smart cooling products
Prerequisites
The power-on commissioning for the upstream PDC of air cooled precision smart cooling
products is completed.