FusionModule1000A40 Prefabricated All-in-One Data
Center
Commissioning Guide
8 Commissioning Core Components
Issue 02 (2019-12-20)
Copyright © Huawei Technologies Co., Ltd.
113
For the diagrams, see the initial configuration parameter manual for the solution in use.
Procedure
Step 1
Turn off the upstream switch of the emergency light power cable.
Figure 8-36
Emergency light
Step 2
Remove the protective cover of the emergency light.
Step 3
Remove the red pin of the emergency light. The emergency light turns on.
Figure 8-37
Removing the red pin
Step 4
Reinstall the protective cover of the emergency light.
Step 5
Turn on the upstream switch of the emergency light power cable.
The emergency light turns off, and the power indicator turns on.
Step 6
Press the red button of the emergency light. The emergency light turns on. When you release
the red button, the emergency light turns off.