Figure 4-6
Installing an adjustable guide rail
2.
Plug the second square holes at the front and rear of the guide rail using the plugs
included to secure the guide rail. See (2) in
.
3.
(Optional) Install an M6 screw in the square hole underneath at the rear of the guide rail
and secure it. See (3) in
.
NOTE
While screws are not necessary for the installation of adjustable guide rails, M6 screws at the rear
end of the server will make it more shockproof and secure.
4.
Install the other guide rail in the same way.
Step 2
Install the server.
1.
Lift the server. This task requires at least two people.
2.
Place the server on the guide rails and slide it into the cabinet. See (1) in
.
2288H V5 Server
User Guide
4 Setup
Issue 04 (2018-09-04)
Copyright © Huawei Technologies Co., Ltd.
73