Figure 4-7
Installing the server
3.
When the two mounting ears of the server come into contact with the mounting bars on
the cabinet, tighten their captive screws to secure the server. See (2) in
.
Step 3
Connect power cables to the server and power on the server. Connect a network cable, a VGA
cable, or USB devices as required.
----End
4.4.3 Installing with Holding Rails
The holding rails are for a cabinet with a distance of 610 mm to 914 mm (24.02 in. to 35.98
in.) between the front and rear mounting bars.
The 2288H V5 servers are stackable onto holding rails.
Step 1
Install the holding rails.
1.
Hold down the ejector release button on the front end of a holding rail and pull out the
hook. See (1) and (2) in
.
2288H V5 Server
User Guide
4 Setup
Issue 04 (2018-09-04)
Copyright © Huawei Technologies Co., Ltd.
74