Step 13
Install the chassis cover. For details, see
3.5 Installing the Chassis Cover
Step 14
Install the server. For details, see
4.4 Installing the Server on Guide Rails
.
Step 15
Connect the power cables. For details, see
Step 16
Power on the server. For details, see
----End
5.18 Right Mounting Ear
To install the right mounting ear, perform the following steps:
Step 1
Wear an ESD wrist strap. For details, see
12 Preventing Electrostatic Discharge
.
Step 2
Power off the server. For details, see
Step 3
Remove the power cables. For details, see
3.7 Removing Cables from a PSU
.
Step 4
Remove the server. For details, see
3.3 Removing the Server and Guide Rails
.
Step 5
Remove the chassis cover. For details, see
3.4 Removing the Chassis Cover
.
Step 6
Remove the air duct or the built-in drive assembly. For details, see
3.10 Removing the Built-in Drive Assembly
.
Step 7
Take a spare right mounting ear out of its ESD bag.
Step 8
Route the mounting ear signal cable through the chassis in the arrow direction. See (1) in
2288H V5 Server
User Guide
5 Optional Part Installation
Issue 04 (2018-09-04)
Copyright © Huawei Technologies Co., Ltd.
172