UPS5000-S-1600 kVA
User Manual
3 Installation
Issue 04 (2020-03-03)
Copyright © Huawei Technologies Co., Ltd.
79
Figure 3-44
Connecting signal cables
4.
Connect the signal cables of the battery grounding failure detector in power unit 3 to the
dry contact card (MUE05A) of control module 2 in the bypass unit.
Figure 3-45
Connecting signal cables
Step 5
Reinstall the top cover for each power unit and the front panel for the SPD in the bypass unit.
----End
3.3.2 Installing a Fan Unit
Configure the fan unit if you install the cabinet against the wall.