7.3 Installing DC Output Power Cables
Prerequisites
Switch off all circuit breakers before installing power cables.
Procedure
Step 1
Remove the front panel and top epoxy board from the PDU.
Step 2
Lay out the DC output cables along the cable ties on the cabinet side.
Step 3
Secure the negative DC output power cable to the corresponding DC output circuit breaker
based on the actual load power.
Step 4
Secure the positive DC output power cable to the corresponding screw on the RTN+ busbar.