5
Installation and Configuration
5.1 Tool Preparations
5.2 Safety Symbols on Devices
5.3 ESD Protection
5.4 Environmental Requirements
5.5 Unpacking the Chassis
5.6 Installing Optional Parts
5.7 Installing the Server on Guide Rails
5.8 Connecting External Cables
5.9 Powering On the Server
5.10 Powering Off the Server
5.11 Initial Configuration (iBMC V250 or Later)
5.12 Initial Configuration (iBMC V3.01.00.00 or Later)
5.1 Tool Preparations
Prepare the following tools:
●
ESD wrist strap or ESD gloves
●
M3 Phillips screwdriver
●
Protective gloves
●
ESD bag
●
Flat-head screwdriver
TaiShan 200 Server (Model 2280)
User Guide
5 Installation and Configuration
Issue 09 (2021-01-12)
Copyright © Huawei Technologies Co., Ltd.
42