6 System Commissioning
Issue 02 (2017-12-12)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
56
6
System Commissioning
6.1 Checking Before Power-On
Table 6-1
Installation checklist
No.
Check Item
Acceptance Criteria
1
SUN2000L installation
The SUN2000L is installed correctly,
securely, and reliably.
2
WiFi antenna installation
The WiFi antenna is installed correctly,
securely, and reliably.
3
Cable layout
Cables are routed properly as required by the
customer.
4
Cable tie
Cable ties are secured evenly and no burr
exists.
5
Grounding
The ground cable is connected correctly,
securely, and reliably.
6
DC switch
The DC switch and all the switches
connecting to the SUN2000L are OFF.
7
Cable connections
The AC output power cable, DC input power
cable, battery cable, and signal cable are
connected correctly, securely, and reliably.
8
Unused terminals and ports
Unused terminals and ports are locked by
watertight caps.
9
Installation environment
The installation space is proper, and the
installation environment is clean and tidy,
without foreign matter.