background image

5

5

Solar inverter

4. Connect cables between the PV string and the solar inverter.

4

Power-On Commissioning

You can add an optimizer on the 

Quick settings 

screen and set its 

physical layout on the 

Physical layout design of PV modules

screen 

of the solar inverter app. For details, see the corresponding solar 
inverter quick guide or 

FusionSolar App Quick Guide

. The solar inverter 

quick guide is delivered with the solar inverter. You can scan the QR 
code to obtain 

FusionSolar App Quick Guide

.

1. Open the FusionSolar

app, log in to 
intl.fusionsolar.huawei.co
m using the installer 
account, choose 

My

Device Commissioning

and connect to the WLAN 
hotspot of the solar 
inverter.

2. Select 

installer

and enter 

the login password. Click 

Log In

. The device 

commissioning screen is 

displayed.

3. Choose 

Device 

Monitoring

, select the 

PV string and check the 
optimizer status.

5

Troubleshooting

Optimizer status

Status Description

Green

The optimizer is 
running properly.

Gray

The optimizer is offline. 
Check that the SN and 
location information 
are correct and search 
for the device again.

Red

The optimizer is faulty.

Fault alarm

Fault Alarm

Cause

Suggestions

Input overvoltage

The output voltage of the PV 
module exceeds the maximum 
input voltage of the optimizer.

Check whether the open-circuit voltage of the PV 
module connected to the optimizer exceeds 80 V.

Overtemperature

The ambient temperature 
exceeds the upper threshold or 
the optimizer is not installed as 
required.

1. Check the ventilation and ambient temperature 

at the optimizer installation position. If the 
ventilation is poor or the ambient temperature 
exceeds the upper threshold, improve the 
ventilation and heat dissipation.

2. If the ventilation and ambient temperature are 

normal, contact the installation contractor.

Internal hardware 
fault

The optimizer is not properly 
installed or is faulty.

Contact the installation contractor.

Summary of Contents for SUN2000-450W-P

Page 1: ...oduct Overview Type II apparatus enhanced insulation Burn warning Electric shock warning Mounting bracket 2 Install the optimizer based on the selected installation mode Properly plan the installation position of optimizers to ensure that the cables between the optimizer and the PV module and between adjacent optimizers can be properly connected and the maximum communication distance between the o...

Page 2: ...hole has been reserved on the PV module frame Prepare the bolt assembly and nut by yourself Ensure that the bolt length meets the installation requirements of the PV module frame PV module Installed on a PV Module Frame Frame Mounting Bracket Front mounted Do not press the optimizer mounting ear against the positioning pole of the frame mounting bracket Purchase the frame mounting bracket separate...

Page 3: ...the output voltage and resistance of a single optimizer PV module connection box Resistance Cause Suggestions 0 9 kΩ R1 1 1 kΩ The optimizer is normal N A R1 0 9 kΩ If the probes of the multimeter are correctly connected the optimizer is faulty Replace the optimizer 1 1 kΩ R1 The sunlight is weak The optimizer input is not connected The optimizer output is connected to the PV module output The opt...

Page 4: ...t is weak 1 1 kΩ R1 The optimizer input is not connected 1 1 kΩ R1 The optimizer output is connected to the PV module output 1 1 kΩ R1 PV string PV string a If R is infinite an open circuit occurs in the PV string or the cables are connected to different PV strings Rectify the PV string open circuit fault and correctly group the PV string cables b If R4 is less than R3 A is the positive cable of t...

Page 5: ...he optimizer status 5 Troubleshooting Optimizer status Status Description Green The optimizer is running properly Gray The optimizer is offline Check that the SN and location information are correct and search for the device again Red The optimizer is faulty Fault alarm Fault Alarm Cause Suggestions Input overvoltage The output voltage of the PV module exceeds the maximum input voltage of the opti...

Page 6: ...re of this model If the DC connectors to be connected are not of the Staubli MC4 model the connector compatibility report and third party lab TUV VED or Bureau Veritas report from the DC connector manufacturer must be available Using incompatible DC connectors may result in serious consequences The resulting device damage is beyond the warranty scope Full configuration scenario For a single phase ...

Page 7: ...regulations specified in this document and the solar inverter user manual Use insulated tools when installing the device For personal safety wear proper personal protective equipment PPE If an optimizer does not connect to any other device connect the OUT and OUT ports of the optimizer respectively to the IN and IN ports to protect the terminals from water It is recommended that the positive and n...

Page 8: ...8 Huawei Technologies Co Ltd Huawei Industrial Base Bantian Longgang Shenzhen 518129 People s Republic of China solar huawei com ...

Reviews: