SmartLi-80Ah
User Manual
3 Installation
Issue 02 (2020-05-17)
Copyright © Huawei Technologies Co., Ltd.
46
When installing a copper bar, connect the part with a round hole to the upper battery
module, and connect the part with a slotted hole to the lower battery module. Install the
part with a round hole first, and then the part with a slotted hole.
Excessive bolts will be used as spare parts.
Figure 3-22
Installing copper bars and cables
Step 6
Install battery module covers.
Place the cables at the notches and ensure that the covers do not press the cables.
If half-capacity cabinet configuration is adopted, install filler panels at the positions where battery
modules are not installed.