3.5 Installing the PLC CCO Using Guide Rails
(Third-Party Device Scenario)
Prerequisites
The guide rails planned for installing the PLC CCO meet the installation position
requirements.
Installation using guide rails applies when the PLC CCO needs to be installed in a third-party
box-type transformer. If this installation mode is selected, the PLC CCO installation space and
securing method need to be planned.
Guide rails are not delivered with the PLC CCO. If users want to mount the PLC CCO along guide
rails, they should prepare 35 mm standard guide rails by themselves.
Figure 3-4
shows the guide rail
dimensions.