Installation Flow
Reference information
Operation
When the delivered subrack has been equipped with boards in cabinet, you can skip the steps involving "Installing
Subrack" and "Installing Boards and Components".
NOTE
If boards have been installed on a PTN 7900-32 before delivery, do not remove any board or module (such as the fan
module) during transportation. To learn how to replace boards and modules after an installation is complete, see the
chapters "Installing the Subrack" and "Installing Boards and Components ".
Installing/Routing E1
Cables
Provisioning Optical
Paths
Preparing for
the Installation
Installation
Precautions
Start
Requirements and
Precautions for
Operating Boards
Required Tools and
Equipment
Cable Holes on
Cabinets
Installing/Routing
Ground and Power
Cables
Installing/Routing
NM Cables
Installing/Routing
Housekeeping
Alarm Cables
Open-End
Corrugated Pipe
Introduction
Installing/Routing
External Fibers
Engineering Labels
OptiX PTN 7900-12
Appearance
Installing/Routing
Cables
Installing Boards
and Components
Performing the
Post-installation
Check
End
Installing a Subrack
Installing Fan
powered box
Installing Boards
Precautions
Installing Cabinet
Doors
Installing/Routing
Fibers
Installing/Routing
Cabinet Indicator
Alarm Cables
Installing/Routing
Network Cables
(GE Electrical
Module Scenario)