background image

HUAWEI TECHNOLOGIES CO., LTD.

OptiX PTN 960  Packet Transport Platform of PTN Series 

Quick Installation Guide

Issue: 08
Date: 2016-01-15

Summary of Contents for OptiX PTN 960

Page 1: ...HUAWEI TECHNOLOGIES CO LTD OptiX PTN 960 Packet Transport Platform of PTN Series Quick Installation Guide Issue 08 Date 2016 01 15 ...

Page 2: ... and features described in this document may not be within the purchase scope or the usage scope Unless otherwise specified in the contract all statements information and recommendations in this document are provided AS IS without warranties guarantees or representations of any kind either express or implied The information in this document is subject to change without notice Every effort has been...

Page 3: ...0 Page 10 Page 8 Page 16 Page 17 Expected Effect of Installation in a 19 Inch Cabinet Installing the External Clock Time Cable Page 11 Page 11 Page 12 Page 12 Installing the Chassis in a 19 Inch Cabinet Page 4 Page 5 Installing the Chassis in an ETSI Cabinet Installing the Chassis in an open rack Page 6 Installing the Chassis into the indoor mini box mounted on the wall Page 7 Installation Flow Ce...

Page 4: ...two horizontal beams If the cable trough does not contain any beams the binding intervals between cable ties cannot exceed 250 mm Verify that the equipment room power supply ground cables and optical cables are ready for installation Start the installation according to the engineering design documents after confirming that conditions are met Refer to the Installation Guide for information about sp...

Page 5: ...ripper Network cable crimping pliers Diagonal pliers Crimping tool Sharp nose pliers Bayonet wrench Paper knife Marker pen Electric iron Heat gun Multimeter Antistatic gloves Binding strap Insulation tape Antistatic wrist strap Punching wire pliers Cleaner Tools for Installation Coax stripper Cable tester Optical power meter BER tester ...

Page 6: ...ace NM interface E1 interface The interface shown in the figure is for reference only The front view is subject to the real PTN 960 equipment The U shaped slots help you tighten the chassis conveniently OptiX PTN960 10 The PTN 960 is available in two models common chassis and extended chassis which are 2 U and 3 U high respectively Installation modes of the two types of chassis are basically the s...

Page 7: ...nuts are correctly installed and install four captive nuts on both sides of the rack Part 1 cable guiding frame 2 Place the chassis s mounting ears and cabling rack U shaped slots over the screws tighten the screws at the bottom 1 Hang the screws of the mounting ears on the chassis to the rack loosely 3 use screws to tighten the top of the chassis 1 4 0 14 N M M4 3 0 0 3 N M M5 2 use the removed s...

Page 8: ... point on the rear rack column of the cabinet Part 1 cable guiding frame M6 screw assembly with flat washers Before installing the chassis in an ETSI cabinet adjust the mounting holes according to the cabinet type 3 0 0 3 N M M6 2 0 0 2 N M M6 1 4 0 14 N M M4 Mark the position that captive nuts are to be installed to ensure that captive nuts are correctly installed and install four captive nuts on...

Page 9: ...6 To the ground points in the indoor ground bar If the rack is with round holes captive screws can be fastened without requiring any captive nuts 2 Place the chassis s mounting ears and cabling rack U shaped slots over the screws tighten the screws at the bottom 1 Hang the screws of the mounting ears on the chassis to the rack loosely 3 use screws to tighten the top of the chassis ...

Page 10: ...ll 2 For details about the installation in scenario IV see Equipment Installation Guidelines IMB Network Cabinet in the Installation Guide Installing the chassis in the network cabinet of the customer b OptiX PTN 960 PTN 960 vertically installed Ventilation OptiX PTN 960 Ventilation The modes of installing the PTN 960 in the network cabinet of the customer vary with the specifications for the netw...

Page 11: ...f the chassis If the PGND cable is installed in the 19 inch cabinet connect the PGND cable to the grounding point of the left mounting ear of the chassis Installing and Routing Cables 1 Common Cables for the Chassis 2 Installing the Protection Grounding Cable Mandatory Protection grounding cable Power cable Telephone wire Shield network cable 120 ohm E1 cable 75 ohm E1 cable Fiber ...

Page 12: ...ables refer to the engineering document on site to install and connect the power cable at the opposite end 0 22 0 03 N M It is recommended that one circuit breaker fuse in the power distribution cabinet corresponds to one set of equipment subrack That is one circuit breaker in the power distribution cabinet outputs one channel of power supply which is provided to only one set of equipment instead ...

Page 13: ...insert the power connector to the power interface on the chassis The PIU boards are of 1 1 hot backup After inserting the power connector tighten the latches on both sides to prevent the connector from falling off Among the four power cables the upper two form one pair and the lower two the other pair Either pair of power cables corresponds to a power supply Therefore these power cables must be pr...

Page 14: ...dius The minimum curvature radius of a 2 mm fiber is 40 mm As the Ethernet service interfaces support the adaptive function the network cable can be either crossover cable or straight through cable The straight through cable is recommended If the equipment needs to install telephone wires install them after installing the Ethernet service cable The installation is similar 6 Installing the Ethernet...

Page 15: ...DCLS time signals Green 4 Tx negative of external clock Grounding Grounding Blue 5 Tx positive of external clock White blue 6 Not defined RS422 input output positive of 1PPS signals RS422 input output positive of DCLS time signals White brown 7 RS422 input output negative of time information Not defined Brown 8 RS422 input output positive of time information Installing the NM Cable 9 Installing th...

Page 16: ... Effect of Installation in a 19 Inch Cabinet The figure above shows expected cabling for the PTN 960 in a 19 inch open rack and it can only be used for reference Cabling for the PTN 960 in other cabinet is similar ...

Page 17: ... the DDF and connect the receive end RX of the BER tester to the transmit end TX of the trunk cable on the DDF Then observe the indicator on the E1 cable tester corresponding to each channel and check whether each indicator is on as expected and whether bit errors are displayed on the BER tester When the indicator on the E1 cable tester is on green it indicates that the connectivity of the E1 cabl...

Page 18: ...bles should be routed correctly in the cabinet 12 The cables outside the cabinet should be routed as follows The cables should be placed tidily and be free of crossover In the case of a cabling ladder the cables should be bound onto the ladder beam tidily If the cabling frame is 0 8 m or more higher than the cabinet top a cabling ladder should be available on the cabinet top to support the cables ...

Page 19: ...powering it on Before the equipment is powered on you must use the multimeter to test whether a short circuit occurs between the positive and negative terminals of the PDU Mapping relation between indicators and their status Indicator Indicator Status Status Description PWRA PWRB On green The power supply is normal Off The power supply fails FAN On green The fan is running normally On red The fan ...

Page 20: ... the tail fiber connection is correct Otherwise check the fiber If the fiber is connected through a flange the deviation should be less than 2 dB When using an optical power meter during a test you are recommended to record the launched optical power of each optical interface and check whether the launched optical power is normal Consult the project supervisor or software engineer and determine wh...

Page 21: ... are four installation holes on either side of the extended chassis and only the two holes in the middle on either side are used for installation 1 When installing a case shaped OptiX PTN device in an IMB the power and fan modules of the device must be in the upper part of the device DC power output interface AC power input interface Battery interface RS232 RS485 Communication interface Installati...

Page 22: ...d OptiX PTN device in an IMB route the power cables on the left and signal cables on the right If it is difficult to install and remove a cable use a fiber extractor 1 The rack mounting ear houses two grounding holes When you install the grounding cable for the device connect the grounding cable to the upper grounding hole 2 When installing power cables connect the DC power output interface to the...

Page 23: ...HUAWEI TECHNOLOGIES CO LTD Huawei Industrial Base Bantian Longgang Shenzhen 518129 People s Republic of China www huawei com ...

Reviews: