background image

                                                                                                                                                         

SON8010U GEPON ONU User Manual

 

陈泽科技有限公司

                                                                                                                              www.stephen-tele.com

 

 

 

 

 

 

 

 

SON8010U GEPON SYSTEM ONU 

User Manual 

 

 

 

 

 

 

 
STEPHEN TECHNOLOGIES CO.,LIMITED 
ALL RIGHTS RESERVED 

Summary of Contents for SON8010U

Page 1: ...SON8010U GEPON ONU User Manual 陈泽科技有限公司 www stephen tele com SON8010U GEPON SYSTEM ONU User Manual STEPHEN TECHNOLOGIES CO LIMITED ALL RIGHTS RESERVED ...

Page 2: ...duct and accessory is missing or damaged 2 Front panel instruction Front panel of ONU have 17 kinds of status indicators as the following picture 3 Back panel instruction Back panel of ONU from left to right in turn is PON Port two RJ45 Ports a bunch port a replacement switch and a power supply jack as following illustrate 4 Indication light instruction The signification of indicator from left to ...

Page 3: ...st automatically speed rate according to the line status Support minimum speed rate adjustment base on 1kbps and establish firm basic to fractionize business for telecommunication dealer Support generally team broadcast function User can choose to achieve mutual video multimedia business by themselves name such as VOD Video conference Bind user MAC address and IP address together in order to preve...

Page 4: ...e the installing requirement as following Power supply requirement 100v 240v alternating current power supply jack and equipment should be within 1 8m Machine should be putted in the ventilated and dry environment there must leave 10cm free space from front to back of machine to airiness Insure that around for machine has enough airiness port in order to diffuse quantity of heat at the same time d...

Page 5: ...SON8010U GEPON ONU User Manual 陈泽科技有限公司 www stephen tele com 3 Connect ONU with relevant bunch port on the PC RS 232 then turn on the power as following chart ...

Page 6: ...hen tele com 4 As the dos prompt shown above input load order as following chart 5 Firstly upgrade Boot code as following dos prompt input rxboot click the file and choose send file then Boot3713_00XX_SPI_8Mb tkf you want to upgrade as following char ...

Page 7: ...ootcode as following chart 6 As above method upgrade app pers in turn Input rxapp order while upgrade app choose App3713_Rxxx_SPI_8Mb tkf file input rxpers order when up grade pers choose Pers3713_RXXX tkf file 7 After finishing the upgrade Pls restart ONU to check if the status is ok or not ...

Page 8: ... in this document The information provided by this document is believed to be accurate and reliable to the publication date of this document However Stephen Technologies Co LTD assumes no responsibility for any errors in this document Furthermore Stephen Technologies Co LTD assumes no responsibility for the use or misuse of the information in this document and for any patent infringements that may...

Reviews: