18
6b
Press the power button switch of engine
6c
Power-on verification
Power on the system by pressing any button on the controller‘s power switch. When the engine is
powered on, disk enclosures will start. The process requires 5-15 minutes.
When the storage system is powering on, the status indicator on the front door of system bay 0 is blinking
green. When the system is successfully powered on, that indicator is steady green.
6 Powering On the Storage System