7
Anchored installation with a base
1. Level the cabinet on the base.
2. Fasten the cabinet to the base and install
conversion bracket and air baffle.
Obtain the screws for securing the equipment
to the base from the fitting bag.
NOTE
3. Install the air baffle.
2. Level the cabinet.
M10x25 (4 PCS)
30
N•m
Conversion bracket is no use when it is non-
anchored installation on an ESD floor.
NOTE