FDT2108D-288&576
Quick Installation Guide
7 Sealing the Cabinet
Issue 02 (2021-06-15)
Copyright © Huawei Technologies Co., Ltd.
19
7
Sealing the Cabinet
Step 1
Fill in the routing table in the file holder behind the front panel of the cabinet.
Step 2
Remove the sheets on the baffle plate (if optical cables need to be led in through the cable
apertures corresponding to the sheets), and install the baffle plate back.
Step 3
Fill sealing material (sealant) into the gap between the cable aperture and optical cables.
Step 4
Fill sealing material (sealant) into the gap between the baffle plate and the bottom plate of the
cabinet.
----End