3 Sealing the Base
2. Seal the
fireproof cl
PVC
1. Close the cable holes on
both sides and at the rear of
the base.
Baffle plate corrugated
pipe
B ffl
Baffle plate
1 Installing the Batteries
Installing the Batteries
Baffle
plate
Fireproof clay
Baffle piece
z
During the installation of the batteries, use
insulated tools such as wrenches and screwdrivers,
and do not reversely connect the positive and
negative poles Otherwise the batteries may burn
z
Before installing storage batteries, set the circuit
breaker labeled BAT on the EPU in the APM30H
cabinet and two circuit breakers labeled BAT on
the PDB in the battery cabinet to OFF. This
prevents high current.
APM30H
IBBS200D/T
negative poles. Otherwise, the batteries may burn,
and the operations may cause human injuries.
2 Installing the Power Cables for the B
Remove the
protecting hood.
1
Install the neg
cable holes with
ay.
3. Install the front panel
on the front of the base.
Fireproof
Fireproof
clay
Check whether the paint on the
cabinet surface is damaged. If
the paint is damaged, repair the
damaged paint.
The PVC corrugated pipe is
recommended for the cable led
out of the cabinet.
The fireproof clay can be used
Fireproof clay
to seal the cable holes of the
base. It cannot be used to seal
the cable holes of the cabinet.
Push the baffle plate
upwards until it is contact
with the screws, and then
atteries
tighten the screws.
Install the copper
bar for series
connections.
5
gative cable.
Install the positive cable.