Figure 5-69
Aligning the male connector with the female connector
Step 3
Hold the shell labeled "PUSH" and feed the male connector into the female connector until
you hear a clicking sound. The male and female connectors are securely installed, as shown in
Figure 5-70
Installed MPO fiber connector
Step 4
To disassemble an MPO fiber connector, hold the shell labeled "PULL" and remove the male
connector, as shown in
.
R250D-E
Hardware Installation and Maintenance Guide
5 Appendix
Issue 01 (2016-09-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
60