background image

 

- 9 - 

1. 

Manual  operation:  Push  the  push  plate  of  the  transfer  switch  to  the  right  for  manual 
operation, and insert the handle into the body. Then you can manually operate the switch. 

2. 

Remove the handle and push the push plate left to the automatic position (which is the 
automatic transfer state) if needed. 

8.7  Description of automatic transfer operation flow of the product: 
 

Power grid — Power grid, Automatic 

charge and automatic recovery mode 

 

Power grid — Generator, Automatic 

charge and automatic recovery 

 

QN: Common side circuit breaker; 
QR: Standby side circuit breaker. 

 

 

 

Use and Maintenance 

9.1  Product commissioning 
After  installation,  the  product  shall  be  commissioned.  Manual  commissioning:  Adjust  the 
automatic/manual switching gear of the transfer switch to the manual gear, and then pull the 
handle to make the product in the state of common closing, dual-split, and standby closing, and 
check whether the product is reliably closed. 
Power-on commissioning: Adjust the automatic/manual switching gear of the transfer switch to 
the  automatic  gear first,  and  then  energize the two  power  supplies.  Commission the product 
according  to  the  product  transfer  process  in  Article  8.7,  and  observe  whether  the  product 
transfer  and  panel  indicator  light  are  normal  and  whether  the  output  state  of  the  secondary 
terminal is correct. 
9.2  Product fault analysis and maintenance 
 

 

Common/standby power 

supply normal 

Common power 

supply abnormal 

Common power supply 

opening 

Transfer to standby 

power supply 

Common power supply 

recovery normal 

Standby power supply 

closed 

Standby power supply 

opening 

Common power supply 

closed 

Transfer to common 

power supply 

Common/standby power 

supply normal 

Common power supply 

abnormal 

Common power supply 

opening 

Standby power supply 

closed 

Standby power supply 

opening 

Common power supply 

closed 

Transfer to standby power 

supply 

Transfer to common power 

supply 

Common power 
supply recovery 

normal 

Generator starting signal output 

Generator voltage reaching 80% of the 

rating 

Output the generator stop 

signal 

Generator 

shutdown 

Summary of Contents for HYT3P Series

Page 1: ...e product please read the instruction carefully and well keep it for future reference Product Certificate This product has passed the inspection and meets the requirements of GB T14048 11 and therefor...

Page 2: ...h body the phase sequence of the incoming terminals of the two power supplies must be consistent and the neutral wire must not be mistakenly connected to the phase wire 7 4 pole and 2 pole transfer sw...

Page 3: ...not exceed 35 C 4 2 The altitude of the installation location shall not exceed 2 000 m 4 3 The relative air humidity at the installation site shall not exceed 50 when the ambient air temperature is 40...

Page 4: ...ectrical life 1 500 1 200 1 000 Use category AC 33B Electrical appliance level PC Contact transfer time 0 6s 20 Transfer operating time 1 3s 10 Return transfer time 1 3s 10 Power off time 0 6s 20 Elec...

Page 5: ...anual transfer switch 7 Sign 8 Grounding screw 9 Indicator light 10 Secondary control line terminal 11 Output terminal 6 2 Controller panel and description Figure 2 Table 2 Product Status 1 2 3 4 Comm...

Page 6: ...voltage Monitoring standby power supply and fault conversion Phase failure voltage loss undervoltage Fire control input DC 24 V Fire control feedback output Indications Common and standby closing indi...

Page 7: ...3P 125 2 224 209 HYT3P 250 4 387 368 170 125 129 8 45 5 HYT3P 250 3 341 323 HYT3P 250 2 295 276 HYT3P 630 4 595 567 255 187 194 13 68 2 HYT3P 630 3 527 499 8 2 4P product main circuit wiring Figure 4...

Page 8: ...d L3 are output terminals A B and C 4 201 is the common power supply neutral wire 5 301 is the standby power supply neutral wire 8 4 2P product main circuit wiring Figure 6 8 4 1 Wiring instruction 1...

Page 9: ...ly is normal 601 and 603 are closed and 602 and 601 are disconnected When the common power supply is abnormal 602 and 601 are closed and 601 and 603 are disconnected 6 501 502 Active input terminal of...

Page 10: ...closed Power on commissioning Adjust the automatic manual switching gear of the transfer switch to the automatic gear first and then energize the two power supplies Commission the product according to...

Page 11: ...nd generator and rated working current of 125 A 11 Ordering Information On the premise that users abide by the use and storage conditions and the product seals are intact if the product is damaged or...

Page 12: ...Address Wenzhou Bridge Industrial Zone Yueqing City Zhejiang Province Service hotline 400 887 5757 Switchboard 0577 62889999 Fax 0577 62885588 Website www huyu com cn...