1  Overview 

The HUM8L Series Earth Leakage Circuit Breaker (hereinafter referred to as “circuit breaker”) is a new 

product successfully developed by our company with international advanced technology in 1990s. This 

product is characterized by perfect protection, reliable performance, high technical specification, 

beautiful appearance and small size, which is an ideal product for upgrading old products. 

Users must carefully read this instruction before installation, use and maintenance to ensure correct 

use and avoid safety accidents. 

2  Purpose and Scope of Application 

This circuit breaker is suitable for the power system with AC 50 Hz, rated voltage of 400 V, and rated 

current up to 630 A. It is used to distribute electric energy, protect the power system from overload, 

short circuit and other faults, and control the infrequent operation of the motor. 

The earth leakage (residual current) protection function of the circuit breaker is to provide indirect 

contact protection for personal electric shock with fatal danger, and also to prevent electrical fire 

caused by long-standing grounding fault current that cannot be detected by the overcurrent protection 

device. 

When the rated residual operating current is set to 30 mA (for the non-delay circuit breaker) and the 

relevant protection device fails, the circuit breaker can also be used as a direct contact protection 

device. 

However, the circuit breaker cannot protect against the electric shock caused by the simultaneous contact 

with two load conductors (two phase wires or any phase wire and neutral wire). 

The rated value of the residual operating current of the circuit breaker as well as the operating time of 

the HUM8LY earth leakage protection can be adjusted. Therefore, selective protection during earth 

leakage can be realized in the power distribution system. 

Classification by DC component: Type AC, ensuring the tripped CBR for the sinusoidal residual current 

without DC component whether suddenly applied or slowly raised. Type AC, ensuring the tripped CBR 

for the sinusoidal residual AC current with specified pulsating DC residual current whether suddenly 

applied or slowly raised. 

3  Standards Followed 

The circuit breaker complies with the following standards: 

IEC 60947-2, GB/T 14048.2 

Low-voltage Switchgear and Controlgear — Part 2: Circuit-breakers

IEC 755, GB/Z 6829-2008 

General Requirements for Residual Current Operated Protective Devices

4  Normal Working Conditions 

4.1  The circuit breaker is suitable for the following working conditions: 

4.1.1  The ambient air temperature shall not be higher than +40°C or lower than -5°C. 

4.1.2  The altitude of the installation location shall not exceed 2,000 m. 

4.1.3  The relative air humidity shall not exceed 50% at the maximum temperature of +40°C. A higher 

relative humidity is allowed at a lower temperature. The average temperature of the wettest 

month shall not 25°C, and the average maximum relative humidity of that month shall 

not exceed 90%. 

4.1.4  Contamination grade: Grade 3. There is no explosion danger and no gas or conductive dust 

that corrodes metals or damages insulation in the surrounding air. 

4.1.5  The installation category is Grade III. 

4.1.6  The "1, 3, 5 and N1" terminals of the circuit breaker are connected to the power supply, and the 

"2, 4, 6 and N2" terminals are connected to the load, which cannot be reversed. 

4.1.7  The intensity of external field at the installation site shall not exceed 5 times of the geomagnetic 

field. 

4.1.8  The installation location shall be free of significant vibration and impact (with the acceleration 

not more than 5 g). 

4.1.9  The installation surface of the circuit breaker shall be vertical to the horizontal plane. The circuit 

breaker is basically installed vertically, with the power supply terminal at the top and the load 

terminal at the bottom, and can also be installed horizontally. 

4.2  The three-phase load of the 3-pole circuit breaker must not have the neutral wire to avoid 

malfunction. 

4.3  Testing device 

When the main circuit is energized, for non-delay circuit breakers, after the test button of the circuit 

breaker is pressed, the circuit breaker shall trip within 0.1 s. For delay circuit breakers, the circuit 

breaker will not trip until the test button is pressed and the set delay value must be maintained. 

4.4  The earth leakage circuit breaker cannot be used in parallel with another one, nor can it be used 

in parallel with other switchgears. 

Summary of Contents for HUM8L Series

Page 1: ...oduct please read the instruction carefully and well keep it for future reference Product Certificate This product has passed the inspection and meets the requirements of GB T 14048 2 and therefore is...

Page 2: ...her suddenly applied or slowly raised 3 Standards Followed The circuit breaker complies with the following standards IEC 60947 2 GB T 14048 2 Low voltage Switchgear and Controlgear Part 2 Circuit brea...

Page 3: ...the non delay type Code Y for the delay type Code B for alarm without tripping Only earth leakage residual current protection function is available Design number Molded Case Circuit Breaker Enterpris...

Page 4: ...ed current In A 10 16 20 25 32 40 50 63 80 100 125 100 125 150 160 175 200 225 250 250 300 350 400 400 500 630 Number of poles 3 4 3 4 3 3 4 3 4 3 3 4 3 3 3 4 3 3 Rated insulation voltage Ui V AC 800...

Page 5: ...Rated values of auxiliary contacts and alarm contacts Conventional thermal current Ith 6 A Rated working current Ie 0 79 A 230 V AC Ie 0 47 A 400 V AC Ie 0 15 220 V DC 8 3 Shunt trip parameters Rated...

Page 6: ...CS1 630 Electric operating mechanism MDX1 MDX2 MDX3 MDX4 Earth leakage alarm module LB 8 4 Parameters of the undervoltage release Rated voltage Ue AC 110 V 230 V 400 V DC 24 V 48 V 110 V The circuit...

Page 7: ...kage alarm module 9 Use and Maintenance 9 1 Considerations before installation of the circuit breaker The appearance of the circuit breaker is in good condition and no load operation works normally Th...

Page 8: ...ions of this instruction and the above articles of this chapter the circuit breaker can be closed and put into operation after completing inspections During the operation of the circuit breaker the te...

Page 9: ...ebsite www huyu com cn In case of any questions please contact the dealer or our customer service department Dear customers To protect our environment please recycle the product or its components when...

Reviews: