2
Installation
2.1
Acceptance and Unpacking
2.2
Hoisting
Figure 3-2.1: Hosting the unit
The hook and barycenter of
the unit should be on a line
in vertical direction to
prevent improper inclination
Make the rope go through
the lifting holes from both
the right and left sides in the
wooden collet
≥
1000mm
When units are delivered check whether any damage occurred during shipment. If there is damage to the
surface or outside of a unit, submit a written report to the shipping company.
Check that the model, specifications and quantity of the units delivered are as ordered.
Check that all accessories ordered have been included. Retain the Owner's Manual for future reference.
Notes for installers
Do not remove any packaging before hoisting. If units are not packaged or if the packaging is damaged, use
suitable boards or packing material to protect the units.
Hoist one unit at a time, using two ropes to ensure stability.
Keep units upright during hoisting, ensuring that the angle to the vertical does not exceed 30°.
Notes for installers
50