Page 16
MI TOWER 4m - ASSEMBLY
STEP
11
Access the tower then carefully fit the second platform on to the
sixteenth rung, making sure that the wind-lock catches engage.
Extend and lock the four component hangers located on either side
of the platform. Transfer the two guardrail brace panels and the set
of toe boards to the component hangers on the second platform.
STEP
12
Position yourself so that you are half way through the second
platform’s trap door. Now manoeuvre yourself so that you are
sitting on the platform, with your legs through the trap door and
your feet on the frame rungs. From this position, you should take
each of the guardrail brace panels, one at a time, and attach so
that the upper jaws are positioned above the twentieth rung.
STEP
13
With both panels in position, you may access the platform. Unfold
the toe board set and position so that they sit on to the outer
edge of the platform. Finally, retract all hangers and the tower is
not complete and ready to use.
INTERMEDIATE WORK PLATFORMS
Any platform fitted to the tower at any stage may be used as a
work platfrom, provided toe boards and guardrail brace panels
are fitted.
332_MI TOWER_12/06/2019