Horisont Stairway
Assembly
6. Push the stairways together, they must be opened the same extent, use the
handrails if necessary. One person should stand beside the joint and check
that all four points on the upper stairway slide into the lower stairways side
rails.
7. Screw in the bolts when the holes align. Use a podger, diameter 12–13 mm,
to align bolt holes.
Pic 31. Coupling stairways on a beam
8. Remove the timber packers and tighten up the anchor plate bolts
9. Used the removed bolts and clamp the upper stairway with these bolts.
10. Turn or tap up the middle moveable anchor plates and clamp the stairways
using them. If more stairways are to be mounted on the same beam, follow
points 5–11.
Assembling the handrail
The handrails should already be mounted in conjunction with mounting the
stairways. Coupling of these is done by first removing the jointing bolts and
then pressing the upper handrail’s lower end over the curved top of the lower
handrail. Then bolt the handrails together with the jointing bolts.