Technical data

Locking device

HP11005 Manual locking device 
All our stairs is delivered with a manual locking device on the stair.

 

Handrails

The handrail comprises an upper rail, intermediate rail and hinged posts. The 

handrail can be fitted to the right hand, left hand or both sides.

1

4

2

3

1.    Steps

2.    Siderails

3.    Locking device

4.    Handrail

Pic 12. Stairway, complete

Bild 11. Manual locking device

HP1019

HP1005

HP1006

HP1009

HP1008
HP1007

Summary of Contents for Horisont Stairway

Page 1: ...Horisont Site stairway User instructions...

Page 2: ...CTION 14 ASSEMBLY 16 Delivery 16 Equipment for assembling and erecting a stairway 16 Equipment for assembling and erecting a stairway with Combibeam 16 Assembling the handrail 17 Jointing 17 Erecting...

Page 3: ...o the inclination and height assuming that the base is level The stairway has a standard width of 750 mm and has expanded metal steps Other widths and models e g wooden steps can be supplied by order...

Page 4: ...isont Safety Systems AB ngsgatan 11 SE 828 32 Edsbyn info horisontsafety se Mainphone 46 0 271 212 75 www horisontsafety se Horisont Stairway General Pic 4 Horisont Stairway equipped with stiffening b...

Page 5: ...oducts other than HSS products are not recommended HSS product liability applies only to com binations of correctly assembled HSS products Always use personal fall protection equipment Personal fall p...

Page 6: ...only safety controlled products Cordon off below and around the assembly area in connection with the instal lation so that unauthorized personnel are not injured if for example you should drop tools o...

Page 7: ...Mainphone 46 0 271 212 75 www horisontsafety se Horisont Stairway Technical data Technical data Loading The stairway can withstand a uniformly distributed load UDL of 1 0 kN m2 Max load per step is 1...

Page 8: ...ination range is 25 50 The example in the diagram is shown with dotted lines and shall be interpreted as follows example within parentheses 1 Start with the total rise height required 4 2 m 2 Follow t...

Page 9: ...ay Technical data Component parts Stairway Steps Self adjusting of expanded metal 3 18pcs Table for supports and beams Stairways with 3 to 15 steps require no additional support however It is advis ab...

Page 10: ...BIld 7 Lutningsdiagram Side rails The side rails are fitted with sleeve joints at the top and with spikes at the bot tom to prevent slipping 15 and 18 step stairways are equipped with a tension stay...

Page 11: ...locking device All our stairs is delivered with a manual locking device on the stair Handrails The handrail comprises an upper rail intermediate rail and hinged posts The handrail can be fitted to th...

Page 12: ...hnical data Additional accessories HP1017 Slab attachment Weight 0 8kg Made from steel bar fitted to the top joint and used to anchor the top of the stairway Pic 13 14 Slab attachment HP1021 Scaffold...

Page 13: ...tep stairways The Combibeam supports a freestanding stairway of up to 36 steps The Combibeam is modular and collapsible Handrails should be joined exactly as the stairway units i e 12 step handrail to...

Page 14: ...h which is attached to the upper side piece snaps into the lower side piece with the help of the handle and thereby locks the stairs so that it cannot be collapsed NEVER enter an unlocked staircase NO...

Page 15: ...ent operatives and a crane or other lifting device Smaller stair ways can also be assembled and erected manually Always perform a risk as sessment before handling Hammer A sole plate or other form of...

Page 16: ...s Fix the stairways together with the bolts Join the handrails by first removing the bolts and then pressing the upper handrail s lower end over the curved section at the top of the lower handrail Scr...

Page 17: ...to the level it is to serve Pic 23 Erecting a stairway 3 Adjust the stairway so that the angeled grip on the upper end is 50 mm above the supporting surface 4 Stand on the lowest step and push the han...

Page 18: ...is to be anchored at the upper end use a slab attachment or scaffold hook Erecting a stairway against a sloping surface When a stairway is erected on sloping earth or rock it should be anchored at bo...

Page 19: ...ft ing off To prevent the stairway Pic 26 Mounting the scaffold attahcments Mounting universal support If a support is used it must always be anchored at two points With a loose surface use a sole pla...

Page 20: ...ort leg to bear on the ground sole plate The top of the leg must be above the top of the the locking device sleeve Tighten the handle firmly so that the support leg is secured in the friction surface...

Page 21: ...with the cross braces downwards 3 Fold out the beam section side beams and lock them with the hinged frames Pic 28 Beam sections with the cross braces downwards 4 Lay out the sections after one anoth...

Page 22: ...from the end of the beam Remove the anchor plate bolts the anchor plate will then lie against the underside of the weld ed jointing nut on the stairway side rail Pic 30 Detail of lower end of beam wi...

Page 23: ...ign bolt holes Pic 31 Coupling stairways on a beam 8 Remove the timber packers and tighten up the anchor plate bolts 9 Used the removed bolts and clamp the upper stairway with these bolts 10 Turn or t...

Page 24: ...stairways and moving stairways attached to a beam can under normal conditions be performed with a crane or similar With regard to coupling a lifting sling refer to heading Erection of stairways and Er...

Page 25: ...tioning Repairs can be performed on some parts that have been rejected by the safety check according to the conditions below Reconditioning must be carried out by a competent person HSS recommends tha...

Page 26: ...checks and which have not been possible to recondition should be discarded and destroyed so that they can not be used Once the stairway has reached the end of it s life due to dam age rusting or wear...

Page 27: ...not safe enough Over time the construction market began to demand the stairs and a larger production and sales started The design was subsequently patented and additional stair lengths were also added...

Page 28: ...Horisont Safety Systems AB ngsgatan 11 828 32 Edsbyn SWEDEN Phone 46 0 271 212 75 e mail info horisontsafety se www horisontsafety se...

Reviews: