
F
F
l
l
i
i
g
g
h
h
t
t
M
M
a
a
n
n
u
u
a
a
l
l
S
S
u
u
p
p
p
p
l
l
e
e
m
m
e
e
n
n
t
t
f
f
o
o
r
r
t
t
h
h
e
e
s
s
a
a
i
i
l
l
p
p
l
l
a
a
n
n
e
e
Document No.: G304eS/AFMSupp, R01
Date of Issue: 11/17
4-1
H
P
H
Ltd.
4.1
Introduction
Section 4 provides checklist and amplified procedures for the
conduct of normal operation. Normal procedures associated with
optional systems can be found in section 9.
4.2
Rigging and de-rigging
Not affected.
4.3
Daily inspection
Daily inspection should be performed before each flight day
opening, both after rigging the sailplane and parking in a hangar.
When inspecting the sailplane check for cracks in surface finish,
blisters or uneven surface, and if in doubt, check with authorized,
specialized personnel.
1
f) Perform FES test run as described in chapter 4.3.3
g) Check the FES system visually especially propeller blades
condition
h) Perform Fire and smoke alarm function test (described in 304eS
Maintenance manual supplement section 1.3.6.1)
4.3.1 Charging the Battery packs
Detailed instructions about charging of Battery packs are described in
separate
FES battery pack manual.
NOTE
It is recommended to charge Battery packs fully just a day or two
before flight is planned. However plan charging so that there will
be enough time for properly completed charging process!