Powering up the server
To power up the server, press the Power On/Standby button.
Power down the server
Before powering down the server for any upgrade or maintenance procedures, perform a backup of critical
server data and programs.
IMPORTANT:
When the server is in standby mode, auxiliary power is still being provided to the system.
To power down the server , use one of the following methods:
• Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the server enters standby
mode.
• Press and hold the Power On/Standby button for more than 4 seconds to force the server to enter standby
mode.
This method forces the server to enter standby mode without properly exiting applications and the OS. If
an application stops responding, you can use this method to force a shutdown.
• Use a virtual power button selection through iLO .
This method initiates a controlled remote shutdown of applications and the OS before the server enters
standby mode.
Before proceeding, verify that the server is in standby mode by observing that the system power LED is
amber.
Extend the server from the rack
WARNING:
To reduce the risk of personal injury or equipment damage, be sure that the rack is adequately stabilized
before extending a component from the rack.
Procedure
.
.
3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server .
4.
Loosen the screws from the latch ears and release the latches on each side of the server .
5.
Extend the server from the rack.
30
Powering up the server
Summary of Contents for ProLiant ML350
Page 12: ...12 Customer self repair...
Page 13: ...Customer self repair 13...
Page 14: ...14 Customer self repair...
Page 15: ...Customer self repair 15...
Page 25: ...Illustrated parts catalog 25...
Page 64: ...SFF configuration Two SAS Expanders 64 Removal and replacement procedures...
Page 91: ...Rack orientation 24 LFF drives Tower orientation Component identification 91...
Page 106: ...Storage controller installed in slot 6 to 9 106 Cabling...
Page 115: ...SFF configuration Two SAS Expanders Cabling 115...