Chapter 1
1-17
Setting Up the Jukebox
Connecting Power
Ch
ap
ter
1
: Setti
ng
up
the Disk Driv
e
S
ettin
g Up
th
e
Ju
kebo
x
Connecting Power
1.
Ensure that the power switch on the jukebox is OFF (“5” on Figure 1-1)
NOTE
Use the power cord shipped with the jukebox.
2. Route the power cord through the strain relief clip (“4” on Figure 1-1) and close
the clip snugly around the cord.
3. Plug the socket end of the power cord into the power port on bottom of the
power distribution assembly ( “9” on Figure 1-1).
4. Continue to route the power cable down, through the long cable slot at the
bottom of the jukebox right side panel, and out through the cable access hole at
the lower left rear of the jukebox (“7” on Figure 1-1).
5. Plug the other end of the power cord into a three-hole grounded outlet.
6. Press the power switch ON (“8” on Figure 1-1)
When power is applied, TESTING and NOT READY alternately display. Once
the poweron test completes (approximately 1.5 minutes), READY displays.
NOTE
If
DEVICE FAILED
displays. See “Troubleshooting” in Chapter 3 for
troubleshooting procedures.
7. Refer to Chapter 3, “Operating the Jukebox” for instructions on setting the SCSI
addresses, loading optical disks into the jukebox, setting a password, etc.
NOTE
Continue on to “Configuring Write Verify” on the next page.
Summary of Contents for Surestore 660ex - Optical Jukebox
Page 10: ...x Figures ...
Page 12: ...xii Tables ...
Page 13: ...1 Setting Up the Jukebox ...
Page 35: ...Using Optical Disks 2 Using Optical Disks ...
Page 41: ...Operating the Jukebox 3 Operating the Jukebox ...
Page 81: ...Supplies and Customer Support A Supplies and Customer Support ...
Page 96: ...A 16 AppendixA Supplies and Customer Support Warranty ...
Page 97: ...Operation on a SCSI Bus B Operating This Jukebox on a SCSI Bus ...
Page 117: ...Safety and Regulatory Information C Safety and Regulatory Information ...
Page 122: ...C 6 Safety and Regulatory Information Declaration of Conformity Declaration of Conformity ...