
Appendix C
Site Preparation
Space Requirements
120
Space Requirements
This section contains information about space requirements for an hp rp7405/rp7410 server. This data should
be used as the basic guideline for space plan developments. Other factors, such as airflow, lighting, and
equipment space requirements must also be considered.
Delivery Space Requirements
There should be enough clearance to move equipment safely from the receiving area to the computer room.
Permanent obstructions, such as pillars or narrow doorways, can cause equipment damage.
Delivery plans should include the possible removal of walls or doors.
Figure C-2
Cabinet Dimensions
Operational Space Requirements
Other factors must be considered along with the basic equipment dimensions. Reduced airflow around
equipment causes overheating, which can lead to equipment failure. Therefore, the location and orientation of
air conditioning ducts, as well as airflow direction, are important. Obstructions to equipment intake or
exhaust airflow must be eliminated.
The locations of lighting fixtures and utility outlets affect servicing operations. Plan equipment layout to take
advantage of lighting and utility outlets. Do not forget to include clearance for opening and closing equipment
doors.
Clearance around the cabinets must be provided for proper cooling airflow through the equipment.
Summary of Contents for rp7405
Page 6: ...Contents vi ...
Page 8: ...Tables viii ...
Page 11: ...Preface ...
Page 15: ...xi Figure 1 Declaration of Conformity ...
Page 22: ...xviii ...
Page 39: ...Chapter 2 17 2 Installation ...
Page 70: ...Chapter 2 Installation Booting HP UX using Boot Console Handler BCH 48 ...
Page 71: ...Chapter 3 49 3 Troubleshooting ...
Page 78: ...Chapter 3 Troubleshooting Common Installation Problems 56 ...
Page 79: ...Chapter 4 57 4 Removal and Replacement ...
Page 111: ...Appendix A 89 A Replaceable Parts ...
Page 122: ...Appendix B System Specifications Environmental Specifications 100 ...
Page 123: ...Appendix C 101 C Site Preparation ...