Standard Operation Procedure
Tabulator
:
Issue Department
:
Xin-Xin Chen
NPSU-PPE
Auditor
:
Ethan Lai
Steps
:
Document No. : Pyxis400
DISASS’Y SOP Station :
Operation Name : Ver. :
Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Qty.
Fixture list (Specification)
Qty.
Pull out Backlight cable
14(1/1)
2017/5/23
1.00
1. Pull out Backlight cable from the hooks, then
pull out it vertically from the top of connector
on M/B (Fig. 1, 2).
Be careful not to make the pin heads of the
connector are crooked.
Tear off the acetate tape (Fig. 2).
Glove Requirements: Half-finger gloves
Fig. 1
Fig. 2
Hook
Tear off the
acetate tape