Standard Operation Procedure
Tabulator
:
Issue Department
:
Xin-Xin Chen
NPSU-PPE
Auditor
:
Ethan Lai
Steps
:
Document No. : Pyxis400
DISASS’Y SOP Station :
Operation Name : Ver. :
Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Qty.
Fixture list (Specification)
Qty.
Take out Panel
30(1/1)
2017/5/23
1.00
Glove Requirements: Half-finger gloves
1. Take out Panel from Front Bezel (Fig. 3).
2. Inspect whether Front Bezel has obvious
defect in the four side, back side and bottom
side (Fig. 1, 2).
No obvious defect in the surface of Front
Bezel, then put it into the material box.
Fig. 1
Fig. 2
Front side
Back side
Bottom side
图
一
LVDS
cable
CT
LAB
EL-2
Fig. 3