Standard Operation Procedure
Tabulator
:
Issue Department
:
Xin-Xin Chen
NPSU-PPE
Auditor
:
Ethan Lai
Steps
:
Document No. : Pyxis400
DISASS’Y SOP Station :
Operation Name : Ver. :
Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Qty.
Fixture list (Specification)
Qty.
Take out Backlight cable
25(1/1)
2017/5/23
1.00
Glove Requirements: Half-finger gloves
1. Pull out Backlight cable from the connector
of Panel (Fig. 1).
Pull out the cable from the red engraved line
to the outside and don't pull it using force.
2. Pull out Control/B cable from the hooks of
BASE PAN (Fig. 2).
Fig. 1
Fig. 2
Backlight
cable
Control/B
cable (TPK)
Control/B
cable (Laibao)