Standard Operation Procedure
Tabulator
:
Issue Department
:
Xin-Xin Chen
NPSU-PPE
Auditor
:
Ethan Lai
Steps
:
Document No. : Pyxis400
DISASS’Y SOP Station :
Operation Name : Ver. :
Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Qty.
Fixture list (Specification)
Qty.
Take out screws and cables
10(1/1)
2017/5/23
1.00
1. Follow the locations of cables from top to
bottom illustrated as Fig. 1 to take out
cables.
2. Unscrew the screws (Torx Pin-Head
×
2)
illustrated as Fig. 1.
Torsion: 4.0
±
1.0 kgf.cm
Take the screwdriver vertically to the screw
holes.
Glove Requirements: Half-finger gloves
Fig. 1
Electric Screwdriver (S-4000MS)
Take out screws
Follow the locations
of cables from top to
bottom to take out
cables