Standard Operation Procedure
Tabulator
:
Issue Department
:
Xin-Xin Chen
NPSU-PPE
Auditor
:
Ethan Lai
Steps
:
Document No. : Pyxis400
DISASS’Y SOP Station :
Operation Name : Ver. :
Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Qty.
Fixture list (Specification)
Qty.
Put Panel
33(1/1)
2017/5/23
1.00
Glove Requirements: Half-finger gloves
1. Put Panel into the material box carefully.