Standard Operation Procedure
Tabulator
:
Issue Department
:
Xin-Xin Chen
NPSU-PPE
Auditor
:
Ethan Lai
Steps
:
Document No. : Pyxis400
DISASS’Y SOP Station :
Operation Name : Ver. :
Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Qty.
Fixture list (Specification)
Qty.
Take out Camera
24(2/2)
2017/5/23
1.00
Glove Requirements: Half-finger gloves
1. Take out CCD switch, then pull out the
camera cable from Camera (Fig. 1, 2).
To confirm whether CCD switch is OK, then
put it into the material box.
2. Tear off the Mylar from the front to the back
of Camera (Fig. 4).
3. Separate CCD bracket and Camera (Fig. 3).
4. Tear off the gaskets (x 2) from CCD bracket
(Fig. 2).
Fig. 1
CCD switch
Position boss
Position side
Pull out the cable
Gasket
Gasket
Camera is affixed to CCD
bracket
Tear off the Mylar from the front
to the back of CCD bracket
Fig. 2
Fig. 3
Fig. 4