Standard Operation Procedure
Tabulator
:
Issue Department
:
Xin-Xin Chen
NPSU-PPE
Auditor
:
Ethan Lai
Steps
:
Document No. : Pyxis400
DISASS’Y SOP Station :
Operation Name : Ver. :
Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Qty.
Fixture list (Specification)
Qty.
Disconnect CCD cable & touch cable
15(1/1)
2017/5/23
1.00
1. Disconnect CCD cable and touch cable from
the connectors of M/B side, then pull out
them from the hooks (Fig. 1).
Pull out the cables vertically from the top of
connectors on M/B.
Pull out the cables moderately to prevent
damaging.
Glove Requirements: Half-finger gloves
Fig. 1