
Hardware Options Installation
49
9. Connect the heatsink connector to the connector on the system board.
Item Description
1
Processor 1 heatsink connector
2
Processor 2 heatsink connector
10. Open the latches on the corresponding PPM slot.
11. Install the PPM for processor 2 (if installing a second processor).
NOTE: PPM 1 is embedded onto the system board.
Summary of Contents for ProLiant ML350 Generation 4p
Page 7: ...Contents 7 Acronyms and Abbreviations 149 Index 153 ...
Page 8: ......
Page 116: ...116 HP ProLiant ML350 Generation 4p Server User Guide ...
Page 118: ...118 HP ProLiant ML350 Generation 4p Server User Guide ...
Page 121: ...Troubleshooting 121 ...
Page 124: ...124 HP ProLiant ML350 Generation 4p Server User Guide ...
Page 127: ...Troubleshooting 127 ...
Page 130: ...130 HP ProLiant ML350 Generation 4p Server User Guide ...
Page 142: ......