sufficient power to operate normally. If the solution is deemed sufficient, a ROM-Based Setup Utility
option, outlined below, can be used to allow the system to operate in this configuration.
If the HP Power Advisor has determined that the server can be reliably powered at low-line power
in this configuration, perform the following steps to override the Power Supply Requirements setting
in ROM-Based Setup Utility (RBSU):
1.
When the server halts, access RBSU.
2.
Select "Advanced Options".
3.
Scroll down to "Power Requirements Override" and choose to enable it.
4.
Exit RBSU,which will reboot the server and should bypass the message on the subsequent
boot.
106 Specifications