Removal and replacement procedures 62
10.
Install the heatsink.
IMPORTANT:
Install all components with the same configuration that was used on the failed
system board.
11.
Install all components removed from the failed system board.
12.
Install the access panel ("
Access panel
" on page
29
).
13.
Install the power supplies ("
AC power supply
" on page
35
).
14.
Power up the server.
After you replace the system board, you must re-enter the server serial number and the product ID.
1.
During the server startup sequence, press the
F9
key to access RBSU.
2.
Select the
Advanced Options
menu.
3.
Select
Service Options
.
4.
Select
Serial Number
. The following warnings appear:
WARNING! WARNING! WARNING! The serial number is loaded into the system during
the manufacturing process and should NOT be modified. This option should only
be used by qualified service personnel. This value should always match the
serial number sticker located on the chassis.
Warning: The serial number should ONLY be modified by qualified personnel.
This value should always match the serial number located on the chassis.
5.
Press the
Enter
key to clear the warning.
6.
Enter the serial number and press the
Enter
key.
7.
Select
Product ID
. The following warning appears:
Summary of Contents for ProLiant DL560 Gen8
Page 12: ...Customer self repair 12 ...
Page 13: ...Customer self repair 13 ...
Page 14: ...Customer self repair 14 ...
Page 64: ...Cabling 64 Cabling SAS drive cabling ...
Page 81: ...Component identification 81 Storage and expansion diagram ...
Page 85: ...Acronyms and abbreviations 85 UID unit identification USB universal serial bus ...