Operations 25
5.
Install the air baffle.
6.
Install the access panel (on page
20
).
7.
Install the server into the rack ("
Installing the server into the rack
" on page
30
).
8.
Connect each power cord to the server.
9.
Connect each power cord to the power source.
10.
Power up the server (on page
18
).