Hardware options installation 63
8.
Connect the capacitor pack cable to the connector on the top of the cache module.
9.
Install the access panel (on page
25
).
10.
Install the server into the rack ("
Installing the server into the rack
" on page
40
).
11.
Connect each power cord to the server.
12.
Connect each power cord to the power source.
13.
Power up the server (on page
23
).
Installing the FBWC capacitor pack
CAUTION:
The cache module connector does not use the industry-standard DDR3 mini-DIMM
pinout. Do not use this controller with cache modules designed for other controller models,
because the controller can malfunction and you can lose data. Also, do not transfer this cache
module to an unsupported controller model, because you can lose data.
To install the component:
1.
Back up all data.
2.
Close all applications.
CAUTION:
In systems that use external data storage, be sure that the server is the first unit to be
powered down and the last to be powered back up. Taking this precaution ensures that the system
does not erroneously mark the drives as failed when the server is powered up.
3.
Power down the server (on page
23
).
4.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
5.
Extend the server from the rack (on page
23
).
6.
Remove the access panel (on page
25
).
7.
Install the FBWC module ("
Installing the flash-backed write cache module
" on page
62
), if it is not
already installed.
Summary of Contents for ProLiant DL385p
Page 65: ...Hardware options installation 65 o 8 or 16 drive SFF o 8 drive LFF ...
Page 91: ...Cabling 91 LFF hard drive cabling Optical drive cabling ...
Page 92: ...Cabling 92 FBWC cabling 8 or 16 drive SFF 8 drive LFF ...
Page 132: ...Support and other resources 132 ...
Page 133: ...Support and other resources 133 ...